PROJECT 01 | Mongla EPZ — 100 kWh Solar Installation
Client Type
Location
System
Products Used
Year Completed
Mongla Export Processing Zone (EPZ)
Mongla, Bagerhat, Khulna
100 kWh On-Grid Solar Installation
182 Solar Panels · ABB Solar Inverter· Metal Structural Frame
2023
Project Overview
Losung Power completed a 100 kWh on-grid solar installation for the Mongla Export Processing Zone (EPZ) in Mongla, Bagerhat, Khulna. The project included the installation of 182 solar panels, ABB solar inverter and metal structural frame as part of the solar power system.
Key Results
- Estimated Annual Solar Energy Generation: ~120,000 kWh
- Reduced monthly electricity bill by 60–70%
- Project ROI achieved within 4.5 years
- Zero safety incidents during installation
PROJECT 02 | Hospital Backup Power System
Client Type
Location
System
Products Used
Year Completed
Private Hospital / Healthcare
Mirpur, Dhaka
500 kVA Cummins Diesel Generator + ATS Panel
REC Solar Panels · SMA Inverter · Aluminium Mounting Structure
2023
Project Overview
A private hospital in Mirpur required a reliable standby power solution to keep critical life-support and surgical equipment running during grid failures. Losung Power Engineering supplied and installed a 500 kVA Cummins diesel generator with a fully automatic transfer switch.
Key Results
- Switchover time under 10 seconds during grid failure
- Full building backup including ICU and surgical wing
- Completed within 3-week project timeline
- AMC (Annual Maintenance Contract) signed post-installation
PROJECT 03 | Sub-Station Supply & Commissioning
Client Type
Location
System
Products Used
Year Completed
Industrial / Manufacturing Plant
Narayanganj, Bangladesh
11kV/0.4kV Package Sub-Station
Package Sub-Station · 3-Phase Transformer · Busbar Trunking System
2024
Project Overview
A large manufacturing plant in Narayanganj required a turnkey 11kV to 0.4kV sub-station package to power expanded production lines. Losung Power Engineering handled full supply, civil coordination, and commissioning.
Key Results
- Fully operational within 6-week delivery and installation timeline
- System capacity sized for 40% future load expansion
- All earthing and lightning protection integrated
- Passed BPDB inspection on first submission
PROJECT 04 | Commercial Building Fire Hydrant System
Client Type
Location
System
Products Used
Year Completed
Real Estate / Commercial Tower
Gulshan, Dhaka
Complete Fire Hydrant & Suppression System
Fire Pump · Jockey Pump · Multiport Valves · Hose Reels
2025
Project Overview
A 12-storey commercial office building in Gulshan required BNBC-compliant fire hydrant and suppression systems before obtaining occupancy certification. Losung Power Engineering supplied and coordinated the full system installation.
Key Results
- Fire safety certification approved by Dhaka City Corporation
- System tested at rated flow and pressure before handover
- Full hydraulic calculation report provided
- Maintenance training delivered to building management team
PROJECT 05 | Battery Swapping Station — EV Delivery Fleet
Client Type
Location
System
Products Used
Year Completed
Last-Mile Delivery / Logistics
Motijheel, Dhaka
Battery Swapping Cabinet + LiFePO4 Battery Packs
Smart Locker Cabinet · 72V LiFePO4 Battery Packs · Solar Charging
2025
Project Overview
A logistics company operating electric delivery scooters in central Dhaka needed a fast battery-swap station to eliminate charging downtime. Losung Power Engineering supplied and installed a 10-slot smart battery swap cabinet with solar-assisted charging.
Key Results
- Battery swap time reduced to under 90 seconds per vehicle
- Fleet uptime increased from 70% to 95%
- Solar charging offsets 40% of station electricity draw
- Remote monitoring dashboard integrated with fleet management
PROJECT 06 | Lightning Protection System — Telecom Tower
Client Type
Location
System
Products Used
Year Completed
Telecommunications / Tower Company
Multiple Sites, Bangladesh
ESE Lightning Arrester + Copper Earthing Network
Air Terminal · Copper Down Conductor · Copper Earth Rod · SPD
2023–2024
Project Overview
A national telecom tower operator engaged Losung Power Engineering to design and install compliant IEC 62305 lightning protection systems across 18 tower sites to protect sensitive RF and transmission equipment.
Key Results
- 18 sites completed across 6 divisions in Bangladesh
- Zero lightning-related equipment damage since installation
- Full compliance with IEC 62305 and BTRC requirements
- Earthing resistance under 5Ω achieved at all sites